Netherlands / Leiden
Enduser
Stadsgehoorzaal
Date of delivery
2015
Upper machinery
1 pc curtain pull SL lier 500kg, 15 pcs SL winches 300kg, 2 pcs side bars by chainhoists (2 per sidebar) SWL 300kg, 2 pcs sound reflectors by SL winches 500kg, 4 pcs DL winches 500kg for sound reflectors.
Lower machinery
High-end control systems
Varicon SIL2 system.
High-end control systems
3 hall bridges, fly loft, cage ladder, servicebridge in the hall to reach the sound reflectors, OHS adjustments for entrance of the new hall bridges.
Details
The location is a monument. Strict building requirements apply.