Netherlands / Heerenveen
Enduser
Het Posthuis Theater
Date of delivery
2013
Upper machinery
Renovation of an existing fly bar installation. Renewal of existing winches, drums, pulleys, steel cables and limit switches.
Lower machinery
High-end control systems
Delivery and installation of the new CL Intecon control of BBH systems. Also the inverters are replaced and the winches are fitted with dual brakes.
High-end control systems
Details
1. Installation of new fly bar installation with computers controls. However the manual fly bar installation with ropes is also still working. By means of sophisticated security devices and procedures , the user can switch to manual mode, in which the pull is brought into balance with counter weights. The former installation is awarded by Dutch Ministry of Education, Culture and Science as cultural heritage.