
This summer, DTS² will completely replace Theater Rotterdam's pull installation.
Preparations for this project, in collaboration with sister company Munter Elektro, the theater and PBTA Theater and Acoustics Advisors are in full swing. The existing winches will be replaced by new winches, produced in cooperation with Stapotech BV. Theater Rotterdam will also receive the latest C·A·T V5 control from Waagner-Biro Stage Systems. This means that the new installation is technical, functional and at the highest level in terms of safety, in accordance with EN-17206 UC6.
After DTS² already renovated the submachinery in the auditorium in 2015, this is a nice sequel to our collaboration with Theater Rotterdam. We are proud that the theater has once again placed its trust in us.