DTS² has created a complete technical installation for Theater Geert Teis in Stadskanaal. For this project, a high-quality control solution was combined with various structures and bridge structures, so that the theater has a flexible and future-proof installation for a variety of productions and stage equipment.
In 2023, DTS² upgraded the draft installations at Schouwburg Het Park to the latest theater standard EN- 17206:2020, implementing the latest SIL3 version of Waagner-Biro: C⋅ A⋅ T V5.
DTS² has designed and installed a unique pull installation for Theater aan het Spui. What is special is that all lifting systems can move horizontally over the entire length of the hall. This ensures an extremely flexible use of the towing and chain hoist installations.