
Netherlands / Arnhem
End user
Theater aan de Rijn (Generale Oost)
Delivery date
2016
Upper machinery
Under machinery
High-end control systems
Structures
Tension grid 10x13m, steel cable Ø3mm, fixed bridge 10m with lifting bridge, 20 pc removable lamp supports on Halfenrails.
Details