Netherlands / Alkmaar

De Vest

No items found.
No items found.
No items found.
No items found.

Project features

End user

De Vest

Delivery date

2014

Upper machinery

Hoist winch for bringing spotlights etc to the audotorium bridges.

Under machinery

Orchestralift based on SPIRA lifting system, 1. An elevator based on SPIRA lifting system. These elevator can also be put in a position it can be used as leveler for loading/unloading and is operated thrue a spindle system.

High-end control systems

All 3 lifts equipped with FLYCON control, with frequency converters.

Structures

2 bridges with a span of 22 metres.

Details

Back to overview