
Belgium / Blankenberg
End user
Casino Blankenberge
Delivery date
2012
Upper machinery
20 flybars 300kg , 1 moveable portalbridge SWL 1500 kg (span 22m), 1 auditorium flybar 500 kg. These flybars have an adjustable speed, max 0,8 m/s.
Under machinery
High-end control systems
Varicon Control System
Structures
1 auditorium bridge, 2 sidebridges, 1 stagebridge and different cageladders.
Details
Delivery of the curtains, DMX was included