
Netherlands / Utrecht
End user
Beatrix Theater
Delivery date
2020
Upper machinery
Replacing a fire protection winch, including return pulleys and steel wires.
Under machinery
High-end control systems
Replaced control of the fire protection winch and implemented an emergency stop circuit. Integration of te control system in the fire alarm.
Structures
Details