Here is a scope of our projects. You can also directly make a selection through the options below.

BE - Ghent- Muziekcentrum De Bijloke

NL - Rotterdam- AHOY Convention Centre

NL - Utrecht- Beatrix Theater

NL - Bussum - Spant Theater

BE - Deinze - Leietheater

NL - Den Bosch - Theater aan de Parade

BE - Ghent - NTGent

NL - Utrecht - Stadsschouwburg Utrecht

NL - Hoogezand - Het Kielzog

NL - Groningen - SPOT/De Oosterpoort

NL - Dongen - De Cammeleur

NL - Groningen - SPOT/De Oosterpoort

NL - Utrecht - Beatrix Theater

NL - The Hague - De Nieuwe Regentes

NL - The Hague - Theater aan het Spui

NL - Amsterdam - Bimhuis

GB - Belfast - Waterfront

NL - Amsterdam - De Brakke Grond

GB - London - Shoreditch Townhall

NL - Groningen - UMCG Hospital - Blue Hall

BE - Tienen - Cultuurcentrum De Kruisboog

NL - Haaksbergen - Theater De Kappen

NL - Arnhem - Theater aan de Rijn (Generale Oost)

DE - Ahaus - Kulturzentrum Ahaus

DE - Weimar - Deutches Nationaltheater

NL - Deventer - Deventer Schouwburg

NL - Leiden - Stadsgehoorzaal

NL - Groningen - Oosterpoort

NL - Kampen - Stadsgehoorzaal

NL - Amsterdam - Beurs van Berlage

NL - Zoetermeer - Stadstheater

NL - Utrecht - Tivoli Vredenburg

NL - Rotterdam - Rotterdamse Schouwburg

NL - Oosterhout - de Bussel

NL - Amsterdam - Vlaams Cultuurhuis de Brakke Grond

NL - Drachten - De Lawei

NL - Amsterdam - Muziekgebouw aan 't IJ

NL - Spijkenisse - De Stoep

NL - Alkmaar - De Vest

NL - Raalte - Hoftheater

NL - Hardenberg - Voorveghter

NL - IJsselmonde - Cultuurwerkplaats

NL - Rotterdam - Rotterdamse Schouwburg

NL - Heerenveen - Het Posthuis Theater

NL - Meppel - Schouwburg Ogterop

NL - Dronten - Meerpaal

BE - Zele - De Zandberg

N - Bodo - Kulturkvartalet

NL - Dordrecht - Energiehuis

B - Blankenberge - Casino Blankenberge

NL - Nieuwegein - De Kom

NL - Roosendaal - De Kring

NL - Kaatsheuvel - De Efteling Themepark
-
BE - Ghent- Muziekcentrum De Bijloke
Constructions: Acoustic reflector system. Upper machinery: 11 selfclimbing winches + trusses SWL 400kg, 4 chainhoists D8 + 500kg. Lower machinery: Podiumlift, built on 6 ND6 Spira lifts. Capacity 4,500kg, lifting speed 0.9 m/min, lifting height 1.5m. Control technology: Genesis® SIL3 for 11 selfclimbing winches and 4 chainhoists, LEV-con for lifting platform Details: The concerthall in the 700-year-old monastery is now equipped with the latest theatre techniques. Delivery: 2020 -
NL - Utrecht- Beatrix Theater
Constructions: n.a. Upper machinery: Replacing a fire protection winch, including return pulleys and steel wires. Lower machinery: n.a. Control technology: Replaced control of the fire protection winch and implemented an emergency stop circuit. Integration of te control system in the fire alarm. Details: n.a. Delivery: 2020 -
NL - Bussum - Spant Theater
Constructions: n.a. Upper machinery: Adjustment of the following hoisting systems (with new encoders and weight measurement): 40 decor winches, 2 side winches, 1 hall truss - chain hoists, 2 hall winches, 2 rear stage winches, 1 portal bridge. Lower machinery: n.a. Control technology: ART-con SIL3, with back-up possibilities. Details: In 2019, DTS² replaced the entire control of the Spant Theater with a SIL 3 safe ART-con control. The existing features were renovated and put into use again. Delivery: 2019 -
NL - Den Bosch - Theater aan de Parade
Constructions: n.a. Upper machinery: Main Hall: Replacement of 2 decor winches, replacement of fire screen winch and veil winch and the controls thereof. Plein Hall: Replacement of 7 winches and their operating system. Lower machinery: Main Hall: Adjustment of the control and safety provision of the orchestra lift. Plein Hall: Lifting mechanism of stage lift with new drive. Control technology: FLY-con Details: n.a. Delivery: 2019 -
BE - Ghent - NTGent
Constructions: n.a. Upper machinery: 45 decor winches, 4 side winches, 1 rideau winch, 2 veil winches, 1 rear winch, 1 hall winch, 2 mobile point winches. Lower machinery: Lorry lift, 17x3.65m, 37 tons load capacity. Drive system: 6x Spira ND18. Lifting speed 3m/min, lifting height 3.1m. Control technology: ART-con SIL3. Details: n.a. Delivery: 2019 -
NL - Utrecht - Stadsschouwburg Utrecht
Constructions: n.a. Upper machinery: n.a. Lower machinery: Orchestra lift. Drive: 8x Spira ND9. Lifting height: 2.4m. Speed: 6m / min. SWL: 5.000kg. Control technology: Waagner Biro. Details: Designing and installing this orchestra lift was a special challenge because only a very limited pit depth was available. Ultimately, the entire lift (platform and drive system) is stored in a 52cm high pit. Delivery: 2018 -
NL - Groningen - SPOT/De Oosterpoort
Constructions: n.a. Upper machinery: Refurbishment of 7 winches and 1 lineshaft winch, to comply with current laws and regulations for moving above persons (double brake, replacing frequency inverters, replacing encoders, placing limit switches). Also placing an extra 250kg linshaft winch. Lower machinery: n.a. Control technology: Maintained the existing control system, but changed from open-loop to closed-loop control. Details: n.a. Delivery: 2018 -
NL - Groningen - UMCG Hospital - Blue Hall
Constructions: n.a. Upper machinery: In the blue room (a public space for lectures) of the UMCG, 1 winch with 4 drums is mounted and implemented. The rod can be pulled out into the ceiling. The system can be operated with a tablet through AMX protocol. Lower machinery: n.a. Control technology: Basicon through tablet with AMX protocol. Details: 1 SL300 winch, AMX control through tablet. Delivery: 2016 -
DE - Ahaus - Kulturzentrum Ahaus
Constructions: 25 fixed suspension positions, fixed bridges with fencing and grids, sound reflectors mounted on winches, orchestra room mounted on rail, steel foundation for winches, 3 transport cars, 2 moveable manteaus. Upper machinery: 10 pcs SL winches 300kg, 0.5m/sec. Lower machinery: Orchestra lift. Capacity 11,200kg, lifting speed 0.9m/sec, lifting height 4m. Control technology: ART-con SIL3. Details: n.a. Delivery: 2016. -
DE - Weimar - Deutches Nationaltheater
Constructions: n.a. Upper machinery: n.a. Lower machinery: 2 pcs. Orchestra lift with Serapid drive. Capacity 13,750 kg, lifting speed 6m/min, lifting height 3,3m. Control technology: ART-con SIL3 control. Details: Replaced consisting orchestra lift for a new orchestra lift built in two parts. Delivery: 2016. -
NL - Leiden - Stadsgehoorzaal
Constructions: 3 hall bridges, fly loft, cage ladder, servicebridge in the hall to reach the sound reflectors, OHS adjustments for entrance of the new hall bridges. Upper machinery: 1 pc curtain pull SL lier 500kg, 15 pcs SL winches 300kg, 2 pcs side bars by chainhoists (2 per sidebar) SWL 300kg, 2 pcs sound reflectors by SL winches 500kg, 4 pcs DL winches 500kg for sound reflectors. Lower machinery: n.a. Control technology: Varicon SIL2 system. Details: The location is a monument. Strict building requirements apply. Delivery: Work in progress - Delivery planned 2015. -
NL - Groningen - Oosterpoort
Constructions: Suspension points chain hoists. Upper machinery: Main hall : - New hoist for seven sound deflector above the stage - 48 pcs chain hoists - Various trusses - 20 existing Verlinde SM chain hoists adjusted and make it suitable for the new controls ( three wireless terminals) Small hall: - Supply and installation of the power distribution - Adapting 35 fly bars so that they comply with EN ISO 13849, Parts 1 and 2 PLd and BS EN ISO 61508 SIL 3. Lower machinery: n.a. Control technology: ART-con SIL3 control system with 3 wireless control units. Interchangeable between both halls. Details: Cooperation with Artthea Bühnentechnik Gmbh. Delivery: 2015 -
NL - Kampen - Stadsgehoorzaal
Constructions: n.a. Upper machinery: n.a. Lower machinery: n.a. Control technology: Conversion of 32 flybars to a new Art-CON control Art-Thea , including the necessary electronics on the winches. Details: Rebuilding occurs during the theatre season. Cooperation with Artthea Bühnentechnik Gmbh. Delivery: 2015 -
NL - Oosterhout - de Bussel
Constructions: n.a. Upper machinery: Small auditorium: 19 line shaft winches 300 kg. Lower machinery: n.a. Control technology: Main hall: Replacing the current control for the ART-con SIL3 control system , including inverters and the necessary electronics on the winches. In total 61 winches are controlled over 2 halls Details: Large hall: Manual wall button operation remains. The existing winch system is modified to comply with the Machinery Directive 2006/42 / EC. Small hall: SIL3. Cooperation with Artthea Bühnentechnik Gmbh. Delivery: 2015 -
NL - Amsterdam - Vlaams Cultuurhuis de Brakke Grond
Constructions: Completely replaced the rear bridge so that better lighting options emerged, replacing all the railings by adjustable railings. Upper machinery: 14 line shaft winches SWL 300 kg (12x fly bars en 2x side fly bars), 4 chain hoists BGVD 8+ 500 kg, 1 lifting point for control panel. Lower machinery: n.a. Control technology: FLYCON control, equipped with inverters for variable speed. Selection buttons on the movable control panel. Details: Building is a monument. Delivery: 2015 -
NL - Drachten - De Lawei
Constructions: Various spot rods , a total of 132 m1 , foundations for pulleys. Upper machinery: 9 line shaft winches 300 kg, 2 chain hoists. Lower machinery: n.a. Control technology: FLYCON control, equipped with inverters for variable speed. Selection buttons on the movable control panel. Details: All installations are suspended from hollow core slabs. Delivery: 2014 -
NL - Spijkenisse - De Stoep
Constructions: Large hall: 2 hall bridges and 2 side bridges with railing. Small hall: portal, side- and rearbridges. Foundation beams Upper machinery: Large hall: fly facilities with 63 electric winches a 500 kg, 2 side winches, 2 pull point winches, movable manteaus, fixed gantry bridges, movable portal bridge, Greek and Wagner/Bayreuth curtain opening installation, grid iron, various mobile chain hoists using moveable crossbars, 6 prosceniumhoists with carriages, 2 movable hall ceilings via electric winches. Small hall: 12 line shaft winches. Lower machinery: Movable orchestra pit floor with 7 movable chairplatforms. Control technology: For large as well as small hall delivery and installation of High end Intecon PRO controls of BBH systems. Details: n.a. Delivery: 2015 -
NL - Alkmaar - De Vest
Constructions: 2 bridges with a span of 22 metres. Upper machinery: Hoist winch for bringing spotlights etc to the audotorium bridges. Lower machinery: Orchestralift based on SPIRA lifting system, 1. An elevator based on SPIRA lifting system. These elevator can also be put in a position it can be used as leveler for loading/unloading and is operated thrue a spindle system. Control technology: All 3 lifts equipped with FLYCON control, with frequency converters. Details: n.a. Delivery: 2014 -
NL - Hardenberg - Voorveghter
Constructions: n.a. Upper machinery: 20 lineshaft winches of 300 kg, 2 side bars on chain hoists and 4 movable chain hoists in loading dock. Lower machinery: n.a. Control technology: Delivery and installation of high end Intecon CL of BBH controls. Replaced inverters and other necessary elctronics. Details: n.a. Delivery: 2013 -
NL - IJsselmonde - Cultuurwerkplaats
Constructions: In five different studios diverse spot rods. Upper machinery: 6 lineshaft winches or 500 kg with variable speed , two complete lifting walls ( 1 architectural finished lifting walls and one full glass lifting wall , both about 12m width and 4 m high ) including winch systems. Lower machinery: n.a. Control technology: Operation Installation FLYCON equipped with inverters and variable speed. Selection buttons on the movable control. Details: n.a. Delivery: 2013 -
NL - Rotterdam - Rotterdamse Schouwburg
Constructions: n.a. Upper machinery: n.a. Lower machinery: Building of 3 under tables and 13 upper tables. Replacement of orchestra platform with tribune-rows. Work preperation and implementation of adjustments of hall lifters 1 and 2 en seperat row 14. Control technology: Current controls are replaced by custom made PLC control with touch screen. Details: Replaced controls and all necessary cabels and electronics.a. Delivery: 2015 -
NL - Heerenveen - Het Posthuis Theater
Constructions: n.a. Upper machinery: Renovation of an existing fly bar installation. Renewal of existing winches, drums, pulleys, steel cables and limit switches. Lower machinery: n.a. Control technology: Delivery and installation of the new CL Intecon control of BBH systems. Also the inverters are replaced and the winches are fitted with dual brakes. Details: 1. Installation of new fly bar installation with computers controls. However the manual fly bar installation with ropes is also still working. By means of sophisticated security devices and procedures , the user can switch to manual mode, in which the pull is brought into balance with counter weights. The former installation is awarded by Dutch Ministry of Education, Culture and Science as cultural heritage. Delivery: 2013 -
NL - Meppel - Schouwburg Ogterop
Constructions: n.a. Upper machinery: Complete range of winches for 42 fly bars, with reuse of existing guiding on the wall and pulleys. Lower machinery: n.a. Control technology: Delivery and installation of High end Intecon PRO controls of BBH systems. Controls for moving side winches. Details: Replacing control fly bar system. Delivery: 2013 -
NL - Dronten - Meerpaal
Constructions: n.a. Upper machinery: Renewal of frequency converters of 44 winches and all winches equipt with new double breaks of type Mayr. Lower machinery: n.a. Control technology: Delivery and installation of High end Intecon PRO controls of BBH systems. Details: Multiple stops. Delivery: 2014 -
NL - Dordrecht - Energiehuis
Constructions: -Renovation of an existing 55tons overhead crane. This crane had to be suitable for a moveable bridge, span 18m - Moveable bridge, span 18m (new) - 24 moveable crane gantries - 1 tensiongrid, consisting of 4 sections of 18x4m, black steel cablel ø3mm - Staircases and cageladders Upper machinery: - 125 chainhosts 250kg and 500kg with adjustable speed - 5 flybars with adjustable speed Lower machinery: Freight lift divided into two parts , load 1x10ton and 1x6 ton, lifting height 9m, speed 6m/min. Spira lifting system. Both lifts can move separately but also together (synchronized). Control technology: Flycon control system for 3 smaller halls, Varicon control system for 1 large hall. Details: The chain host installation is equipped with an operating system that provides drives and groups. Delivery: 2013 -
B - Blankenberge - Casino Blankenberge
Constructions: 1 auditorium bridge, 2 sidebridges, 1 stagebridge and different cageladders. Upper machinery: 20 flybars 300kg , 1 moveable portalbridge SWL 1500 kg (span 22m), 1 auditorium flybar 500 kg. These flybars have an adjustable speed, max 0,8 m/s. Lower machinery: n.a. Control technology: Varicon Control System Details: Delivery of the curtains, DMX was included Delivery: 2012 -
NL - Roosendaal - De Kring
Constructions: n.a. Upper machinery: n.a. Lower machinery: n.a. Control technology: Delivery and installation of the new CL Intecon control of BBH systems. Also the inverters are replaced and the winches are fitted with dual brakes Mayr Silenzio. Details: This involved the conversion of an existing installation that was equipped with an automated control system that no longer met the modern requirements. Delivery: 2012 -
NL - Kaatsheuvel - De Efteling Themepark
Constructions: 3 hall bridges, fly loft, cage ladder, servicebridge in the hall to reach the sound reflectors, OHS adjustments for entrance of the new hall bridges. Upper machinery: n.a. Lower machinery: 1 lifting table 7500kg, 24m/min, height 4m, for use of goods and live animals or persons. 2 tipping tables for use of goods, persons and animals Control technology: PLC Control System Details: System is interconnected with other high end systems so the whole system is fully controlled. Efteling is a big amusement park. The lifting tables are used for a large entertainment show 6-8 times a day Delivery: 2011